FAUST pictures FAUST installed on the end of the MARS line. FAUST installed in the FAUST Chamber. End of MARS Line. The back side of ring A of FAUST, each ring has the power supplies daisy chained through each detector telescope. Ring C of FAUST, which has 16 detector telescopes. Ring E of FAUST installed in the FAUST support chamber.